SY Windarra · Langkawi

Who does what

Langkawi refit · through Oct 5Commission before Oct 6 departure

Contractors

18

Task 1 is the trial. If the contractor is good, continue down the list.

Langkawi

1

Mectra Synergy · Northern Lights agent

Generator first · panel and stern light asked too

Checking availability · +60 11-3219 4895
  1. 1Await confirmed visit timeTRIAL
  2. 2Diagnose M673L excitation fault and exact brushes
  3. 3Repair and load-test generator
  4. 4If panel and light are declined, move them to Matt / LMS
2

DSE referral → registered LPG contractor

LPG and stove

WhatsApp delivered Sep 4 · keep bottle closed
  1. 1Await the named Suruhanjaya Tenaga-registered fitter who attends RLYCTRIAL
  2. 2Verify registration before booking
  3. 3Leak-test bottle-to-appliance system
  4. 4Fix stove flame
  5. 5Test BEP detector, solenoid and shutoff
  6. 6If no island fitter, call ATL Juara in Sungai Petani
3

Nick Teh Electrical · Saad referral

Generator, panel, stern light and shower pipe

Sep 5 · 10:30 proposed at E7 · awaiting confirmation
  1. 1Confirm the meeting timeTRIAL
  2. 2Assess Northern Lights generator and engine-panel experience
  3. 3Inspect stern light and exterior-shower pipe scope
  4. 4Award no work before the capability check
4

Saad · MsJ Yachtfix Carpenter

Chainplate and deck fittings

Sikaflex work · Oct 1 planned
  1. 1Repair accepted chainplate and deck-fitting leak pointsTRIAL
  2. 2Control loaded chainplate one at a time
  3. 3Hose-test every repaired point
  4. 4Reconcile written scope and price if still missing
5

Matt · LMS Langkawi Marine Services

Solar connection, shower and winches

Scopes discussed · prices/dates open
  1. 1Itemise solar connection after arch designTRIAL
  2. 2Confirm whether Matt installed Windarra's earlier solar with Olly
  3. 3Quote and schedule exterior shower
  4. 4Quote one stiff Barient winch as a bounded trial
  5. 5Do not add generator work without proved experience
6

Marine Supplies Asia · Sarah

Rainman watermaker and EPIRB

Sep 2 · time TBD · RM180/hour
  1. 1Diagnose Rainman watermakerTRIAL
  2. 2Repair only confirmed watermaker fault
  3. 3Reserve replacement EPIRB
  4. 4Program EPIRB after Polish MMSI
7

B&V Marine

Exterior shower fallback

Use only if LMS quote fails
  1. 1Quote exterior freshwater shower if neededTRIAL
  2. 2Confirm travel and RLYC access
  3. 3Pressure and drainage test completed work
8

Red Cap Sailing School

Marine radio course

Book now
  1. 1Complete RYA SRC course and examTRIAL
9

Hendrick · Asiatic Marine

Raymarine autopilot and NMEA mapping

Measure Sep 5 · deposit Sep 7 if fit passes
  1. 1Confirm drive fit and geometryTRIAL
  2. 2Record actual deposit only when paid
  3. 3Install, calibrate and sea-trial EV400 / Type 2 autopilot
  4. 4Map TEAM SERVE modes separately
10

Robbie · Andersson Marine

Beta engine and mechanics

Book robust baseline
  1. 1Change engine oil, oil filter and both fuel filtersTRIAL
  2. 2Drain, flush and refill correct Beta-compatible coolant
  3. 3Inspect transmission fluid, belt, hoses, clamps and zinc
  4. 4Diagnose tachometer and inspect exhaust elbow
  5. 5Run, load-test, leak-check and label cruising spares
11

John Champion · Champion Marine

Solar equipment supplier

650W nearly confirmed · wait for arch design
  1. 1Supply exact 650W panel plus SRNE 50A MC2450N10TRIAL
  2. 2Preserve supplier acceptance for the 650W pairing
  3. 3Supply array cable, MC4s and breaker
  4. 4Do not substitute the 670W variant
12

Nico / local Hypalon patcher

Temporary dinghy patch

During Langkawi refit
  1. 1Confirm tube fabricTRIAL
  2. 2Patch active leak only
13

Auto-electrician · name needed

Spare alternator

Book
  1. 1Fit matching 6PK pulleyTRIAL
  2. 2Check pulley alignment
  3. 3Bench-test spare alternator
14

Marine fire technician · name needed

Engine-space fire protection

Sep 14–20
  1. 1Size engine-space protectionTRIAL
  2. 2Install and test approved equipment
15

Kuah signmaker · name needed

Hull lettering

Sep 14–20
  1. 1Prepare lettering proofTRIAL
  2. 2Install Windarra, POL001U1R and Gdansk

Phuket

1

Jason Corall · Phuket Yacht Services

Rigging

Late Oct · slot pending
  1. 1Inspect standing rig and provide written reportTRIAL
  2. 2Correct the staysail fairlead and sheet lead
  3. 3Identify and fit the correct main-halyard lock
  4. 4Replace binding mizzen halyard
  5. 5Diagnose and free the stuck spinnaker pole
2

South East Asia Sails → SEAM Upholstery

Canvas

Introduction early Oct · measure after arrival
  1. 1Book onboard measurementTRIAL
  2. 2Repair one damaged existing canvas item
  3. 3Quote main awning
  4. 4Make main awning after trial
3

Mia Gillow · North Sails Phuket

Sails

Late Oct · availability/price pending
  1. 1Repair staysail chafeTRIAL
  2. 2Repair or replace genoa UV strip
  3. 3Check spare jib fits furler